LUKISAN TERPERINCI PINTU ( DOOR DETAIL DRAWING )

INTERNAL DOOR


FIRE DOOR ( PINTU RINTANGAN API )







Category: , Comments

TANGGA ( STAIRCASE )

CARA2 FORMWORK TANGGA DIBINA.

PANDANGAN HADAPAN

PANDANGAN TEPI
PANDANGAN BELAKANG


FORMWORK DIBINA MENGIKUT LUKISAN2 YANG TELAH DILULUSKAN OLEH JURUTERA STRUKTUR DAN AKITEK. INI ADALAH CONTOH2 LUKISAN TERPERINCI TANGGA ( STAIRCASE DETAIL )


Category: Comments

RC LIFT CORE

RC LIFT CORE PADA PERINGKAT AWAL PEMBINAAN. LIHATLAH STEEL BAR DAN FORMWORKNYA.


RC LIFT CORE SELEPAS DIKONKRIT


PANDANGAN DI DALAM RC LIFT CORE SHAFT.
PANDANG LIFT LOBBY DARI LUAR. JUGA KELIHATAN RC WALL OPENING UNTUK LIFT CALL BUTTON.
PANDANGAN LIFT CORE SHAFT DARI ATAS. FORMWORK MASIH BELUM DIBUKA LAGI.
Category: Comments

AIR-COND - RETURN AIR GRILL

BINGKAI KAYU ( TIMBER FRAME ) PERLU DIPASANG PADA MIVAN SEBELUM DINDING DIKONKRIT ( KERANA INI ADALAH DINDING KONKRIT MIVAN ) UNTUK BUKAAN PEMASANGAN RETURN AIR GRILL INI. RETURN AIR ADALAH UNTUK KITARAN UDARA PENGHAWA DINGIN.

Category: Comments

HOT AND COLD WATER - BASIN INSTALLATION

GROOVED LINE UNTUK PAIP BASIN ( KIRI ) DAN LONG BATH ( KANAN ). PAIP BIRU ADALAH UNTUK AIR SEJUK ( ABS PIPE ) DAN PAIP TEMBAGA BERSALUT UPVC ( UPVC INSULATED COPPER PIPE ) ADALAH UNTUK AIR PANAS.
OUTLET POINT PERLU DITUTUP UNTUK MENGELAKKAN DARIPADA TERSUMBAT KETIKA KERJA2 MEMASANG JUBIN DIJALANKAN. DUA SKRU YANG KELIHATAN IALAH BRAKET UNTUK MEMASANG BASIN ( WALL MOUNTED )


BASIN SIAP DIPASANG.
Category: Comments

PLUMBING - LONG BATH INSTALLATION

GROOVED LINE ATAU LONGKANG KECIL UNTUK PAIP TELAH DI'SET' SEBELUM DINDING DIKONKRIT ( DINDING INI ADALAH DINDING KONKRIT MIVAN ).


PAIP AIR SEJUK ( ABS PIPE BERWARNA BIRU ) ADALAH UNTUK AIR SEJUK ( COLD WATER ) DAN PAIP TEMBAGA BERSALUT UPVC ( UPVC INSULATED COPPER PIPE ) UNTUK AIR PANAS. INI ADALAH PAIP UNTUK 'LONG BATH'.



'LONG BATH' PADA PERINGKAT AWAL PEMBINAAN. BATU-BATA DIGUNAKAN UNTUK MEMBUAT PLATFORM 'LONG BATH' INI.


KEMASAN AKHIR 'LONG BATH' TETAPI LONG BATH MIXER MASIH BELUM DIPASANG UNTUK MENGELAKKAN BERLAKUNYA KECURIAN ATAU KEROSAKKAN.
Category: Comments

CLIENT / ARCHITECT PRESENTATION

INI ADALAH CONTOH2 LAPORAN YANG DIKEMUKAKAN KEPADA ARKITEK, PEMILIK BANGUNAN ( OWNER ) DAN KONSULTAN. UNTUK MENYEDIAKAN LAPORAN INI AMAT RUMIT. SETIAP LAPORAN MESTILAH TEPAT KERANA JIKA IANYA DIDAPATI TIDAK TEPAT, INI AKAN MENIMBULKAN KERAGUAN TENTANG KREDIBILITI KONTRAKTOR YANG TERBABIT. LAPORAN INI JUGA MELAPORKAN TENTANG APA YANG BERLAKU DI TAPAK BINAAN ( SITE ). LAPORAN2 DI BAWAH ADALAH 100% DISEDIAKAN OLEH SAYA DAN SAYA JUGA TELAH MENJADI PENGERUSI ( CHAIRMAN ) DI UNTUK PEMBENTANGAN ( PRESENTATION ) INI.


MUKA DEPAN LAPORAN. ( NAMA PEMILIK BANGUNAN, KONSULTAN DAN KONTRAKTOR UTAMA TELAH SAYA PADAMKAN ).

M&E SUB-CONTRACTOR AS BUILT DRAWING REPORT
M&E O&M ( OPERATION & MANUAL ) SUBMISSION REPORT


M&E T&C ( TESTING AND COMMISSIONING ) PROGRESS REPORT






BERIKUT ADALAH DI ANTARA MASALAH2 M&E YANG MASIH BELUM DISELESAIKAN. BIASANYA, KEADAAN KETIKA MEMBENTANGKAN ISU INI MENJADI PERDEBATAN PANAS DI ANTARA AKITEK, KONSULTAN TERHADAP KONTRAKTOR UTAMA DAN SUB-KONTRAKTOR. SAYA ADALAH DI ANTARA ORANG YANG 'KENA JAWAB' KE ATAS SEGALA PERMASALAHAN YANG TERJADI. DARI SINILAH SAYA DAPAT MEMPELAJARI CARA2 MENGAWAL EMOSI SERTA BERTUTUR DENGAN BAIK. 95% BAHASA YANG DIGUNAKAN IALAH BAHASA INGGERIS.


Category: Comments

ME HIGH LEVEL INSTALLATION

PROSES PEMASANGAN PERANCAH UNTUK PROSES MENGECAT DINDING DAN SOFFIT SERTA UNTUK PEMASANGAN SILING. UNTUK MELAKSANAKANNYA, LANGKAH2 KESELAMATAN PERLU DIUTAMAKAN UNTUK MENGELAKKAN DARIPADA KEMALANGAN.


KELIHATAN LUBANG PETAK SEBAGAI TEMPAT LALUAN UNTUK PEMASANGAN SUPPLY AIR-COND DUCT. BILIK KECIL DIBELAKANGNYA ADALAH BILIK FCU ( FAN COIL UNIT )

SUPPLY AIR-COND DUCT 80% SIAP DIPASANG. KONTRAKTOR CAT HANYA MENGECAT DI KAWASAN AIR-COND DUCT SAHAJA TERLEBIH DAHULU UNTUK MEMBERI LALUAN KONTRAKTOR AIR-COND MENYIAPKAN KERJA.
SCAFFOLDING ( PERANCAH ) DIPASANG UNTUK PEMASANGAN SILING DI DEWAN SERBAGUNA INI. KETINGGIANNYA DIANGGARKAN MENCECAH 11METER.

PERANCAH UNTUK PEMASANGAN SILING DAN MATERIAL M&E. SELEPAS SILING SIAP DIPASANG, M&E AKAN MEMULAKAN KERJA. ANTARANYA IALAH HIGH BAY LAMP ( LAMPU TINGGI ), PAIP SISTEM PENCEGAH KEBAKARAN ( SPRINKLER ) DAN SISTEM PENGHAWA DINGIN. KELIHATAN PERANCAH INI TELAH DIGUNAKAN UNTUK MEMASANG ACMV SUPPLY AIR DUCT.
KELIHATAN PEKERJA SEDANG MELAKUKAN KERJA2 'WELDING' UNTUK PEMASANGAN PAIP AIR-COND ( CHILLED WATER PIPE SUPPLY & CHILLED WATER RETURN PIPE ).

FAN COIL UNIT ( DI DALAM BILIK FCU )


'CLOSED-UP' DARI BILIK FCU. PAIP YANG KELIHATAN ADALAH CHILLED WATER PIPE.

KEMASAN AKHIR DEWAN INI



SEBENARNYA, BANYAK LAGI PROSES YANG TIDAK DAPAT SAYA MASUKKAN KE DALAM ENTRY INI. DI ANTARANYA IALAH PEMASANGAN LANTAI KAYU DEWAN, SKIM COATING, ALUMINIUM WINDOW DAN SEBAGAINYA. KESIMPULAN TENTANG GAMBAR PROSES2 DI ATAS, UNTUK MEREKA SEBUAH BANGUNAN ATAUPUN SESUATU DEWAN, BILIK DAN SEBAGAINYA ANDA JUGA HARUS MEMIKIRKAN TENTANG KEMASAN AKHIR SERVIS2 M&E.
Category: Comments

PUMP

COLD WATER HDROPNEUMATIC PUMP

WET RISER PUMP ( PANCUR BASAH )
Category: Comments